Now that car repairs are over for my wife's car and waiting on a part for the Rover I addressed my kitchen remodel yesterday. It has been sitting patiently waiting since we ground off the old floor a few weeks ago.

I finally took a tape measure, pencil and level and mapped out on the wall where the upper cabinets will go. This was important because I had left wires in different parts of the walls behind the new sheet rock for the under cabinet lighting that will eventually be installed. Since I am building my cabinets from scratch I have a bit of leeway on measurements but so far the upper cabinets will be pretty standard in sizes. 18 inches above the counters, 42 inches to the ceiling (no fur-down). 12 inches deep and in widths of 12", 15, and 30. I installed after-construction outlet boxes for the wiring, just below where the upper cabinets will meet the back splash (nice glass tile mosaic), they are controlled by a switch I added at the kitchen entry.

Next step will be to float and tape all the drywall. I will use hot mud to start with and then finish off with the regular stuff.
chrisinhouston is offline   Reply With Quote