I placed the sub table assembly upside down on the bottom of the finished table top and got it all lined up with the measurements in the plans, while accounting for those 2 extra centimeters in width. As I was doing this, I almost forgot to put the clamp down bolts in place in the trunnions. But I remembered. Then I screwed everything down.
I moved the table to the band saw, and fed the blade through the saw kerf in the table top to get it onto the frame. I tested setting it at an angle and clamped it down. It worked great. Nice and solid.
But most of my work will be done with the table set in the level position, so I set the table square to the blade and drew a line across the joint between the trunnion and trunnion support to mark the 90 degree line up.
There is still a fair amount left to do. I have to make the enclosures. And I need to bolt the motor to the frame, instead of using temporary clamps, and I need to do the electrical stuff. Right now I plug it in to start it and unplug it to stop it