View Single Post
Old 07-26-2017, 10:35 AM   #712
glatt
 
Join Date: Jul 2003
Location: Arlington, VA
Posts: 27,717
So here is where we stopped for now up in the bathroom. I'll make the connections later. It will be a big rushed job because I have to shut the water off to the house and need to make about 100 connections before we can turn the water back on again. Basically a day without plumbing.

Name:  pex 1414 done to bathroom.JPG
Views: 170
Size:  52.5 KB

And this is what it looks like inside the upstairs bathroom wall. See all the drilling I did without ever breaking through in any of those holes? This was while all contorted inside a freaking cabinet.
Name:  pex 1417 bathroom butcher job.JPG
Views: 167
Size:  76.0 KB


More as this project progresses. Maybe this weekend.
glatt is offline   Reply With Quote