alright. we went into overtime tonight. after supper we started pouring concrete. i had wanted to get a pic of the shower drain flange and the amount of distance from the floor to the bottom of the flange but paul started mixing concrete and i had to haul butt to help so i didn;t have my camera on me. anyway, there was about a 3 inch gap or more between the existing concrete and the bottom of the flange. i cut off one inch earlier today and recommended more but paul didn;t want to do that. well i finally convinced him. reasoning being we would loose depth of the finished floor if we left it the way it was. so i took off one more inch from the drain pipe then set the flange. we mixed 1 and 1/3 bag of quickcrete and floated in a floor. when doing this sort of thing you want the cement dry. add only enough water to make it moist then use a trowel and level it as best you can using a level. doesn;t have to be perfect. the installation kit we are using makes the slope fool proof.
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#167 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
.
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#168 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
now all we do is wait for the crete to cure. in this case we are only going to wait about an hour. then we will set the quick slope installation kit and pour the rest of the crete.
in these next pics, sort of another interactive if you will, we are looking and trying to decide what paint color we want for the walls. the tile is the tile that is going in the shower. i like the darker but the lighter colors also bring out contrast. any thoughts?
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#169 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
we hit a dead end tonight. the ring that goes around the drain is the wrong size. BUT we did get the rubber pan in. first we laid it out then tucked in the corners then located and punched through the drain bolts then put the flange on and tightened it down. after that it was cut to fit but make sure you don;t cut less than 3 inches from the floor. any folds that need to be made can be hidden by the drywall.
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#170 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
.
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#171 |
“Hypocrisy: prejudice with a halo”
Join Date: Mar 2007
Location: Savannah, Georgia
Posts: 21,393
|
Don't the sheets have to glue together at the seams?
__________________
Anyone but the this most fuked up President in History in 2012! |
![]() |
![]() |
![]() |
#172 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
no, not in this case. it was like a 4 x 6 sheet of rubber basically. so you place it in and cut to fit and fold on the seams. at least that;s what we did here. i;m sure there are several ways to do this part of the job. first time doing it so maybe we half assed it. i dunno. more than one way to skin a cat. i figured the weight of the concrete and the mold resistant drywall being mounted would suffice. if there is a better or easier way that you know of please by all means let me know. we may be doing this again upstairs.
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#173 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
i took these pics before i had to leave for work. paul went and got the correct ring so we could cut and mount the slope sticks. then he poured in the concrete.
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#174 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
then while he was doing that i was finishing up the deck installation at work. to space the 2x6x10 and 12;s i used nails and put them between them to give room for weather. the boards will expand and contract in hot and cold weather respectively so you want a little wiggle room. then for the boards that were slightly warped i stuck a crowbar in the ground and leaned on it while drilling in the decking screws. after the decking was complete i ran a chalk line down the sides and trimmed off the excess with a circular saw.
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#175 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
.
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#176 |
™
Join Date: Jul 2003
Location: Arlington, VA
Posts: 27,717
|
You get a lot accomplished. I'm impressed.
|
![]() |
![]() |
![]() |
#177 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
ty, i try. all it really is though is focus. well, energy too, lots and lots of energy
![]() i;m glad i finished that deck yesterday because there are 10 parties booked for today. we thought it was 11 but the manager miscounted. either way 10 parties is a lot and several of them overlap. i betcha by sunset i will have completed my 2 step videos on the proper way a go kart ride should go and the "omfg what are you doing" way. now that is gonna be a fun thread! ![]()
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#178 |
Doctor Wtf
Join Date: Oct 2007
Location: Badelaide, Baustralia
Posts: 12,861
|
Ya know, that bathroom job started out with a dripping tap. We'll just replace the washer, they said, but then they saw something else that needed doing while they were there. One thing leads to another ...
__________________
Shut up and hug. MoreThanPretty, Nov 5, 2008. Just because I'm nominally polite, does not make me a pussy. Sundae Girl. |
![]() |
![]() |
![]() |
#179 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
yep and that;s what i;m afraid of upstairs. to be honest i just got home from work and didn;t even go look in the downstairs bathroom. i;m exhausted, i got nailed by a kid tonight and almost broke, what felt like anyway, my right foot. got sandwiched between two cars. will have vid later for the thread i;m creating. on a motrin and beer binge, errrr for a whole beer then bed. the new party area was used and rented today. a plus there. we were the busiest ever in the history of the go kart track! we had a line of more than 50 people waiting to ride from 1 o;clock until about 11. gonna hit the rack. later peeps.
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#180 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
the finished party area. done. finished. finis. hoàn thành. завершенный. fertig.