![]() |
|
Quality Images and Videos Post your own images and videos of your own days |
![]() |
|
Thread Tools | Display Modes |
![]() |
#46 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
okaaaay. here's the next project. (where the hell are they coming from and why do they find me??) at the go-kart track today we moved the carport over about 6 inches for better sidewalk access for customers. after that we busted up the front curb at the exit for the go karts from the pit. we are going to pour concrete and taper it down to grade.
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#47 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
in pic #4 we have to cut the rail with a cutting torch about 2 inches past the concrete you see there
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#48 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
in pic #5 i drilled a tap hole in the concrete to fasten the rail to the concrete. pic #6 is bob giving me support while i drilled the hole for the anchor bolt. pretty nifty gadget the bolt is. you hammer it in and then tighten down the nut. when you tighten the nut the ass end of the bolt flairs anchoring it in place. pic #7 is using the cutting torch to make an anchor hole in angle iron for the rails. ok pic #8 here is 1X1 (??) angle that we welded bolts to for anchor support when we pour concrete. the angle is going to be installed on both the inside and outside of the sloping down curb.
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#49 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
and finally in pic #9 here we're cutting down the existing rail prepping it for the downgrade and tapering. far as we got today. more tomorrow.
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#50 |
LONG LIVE KING ZIPPY! per Feetz
Join Date: Mar 2003
Location: Arkansas
Posts: 7,661
|
Fun Fun Fun !!!
From some body Who has to run a rotohammer Way to much , they work Best when the hammer inside has room to do its thing , as in if yer drilling straight down Sitting on the rotohammer don't work so well , Keep a hold of the drill and Some Pressure on it , But the RotoHammer should be able to Bounce a Bit , think of it Like this , when yer driving a Nail with a claw Hammer you draw the hammer BACK to put some Muscle into the Hit , same thing with a rotohammer
__________________
"Success is getting what you want. Happiness is wanting what you get. " Brother Dave Gardner |
![]() |
![]() |
![]() |
#52 | |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
Quote:
__________________
For your dreams to come true, you must first have a dream. |
|
![]() |
![]() |
![]() |
#53 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
oh and here is a tour of our racing facilities!
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#54 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
at the beginning of the vid you can see what our end result of the curb at the front of the pit is supposed to look like
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#55 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
alright day two and job nearly complete. pic 1 is where we left off yesterday. today we cut the rail on the right side that was bent and replaced it with a straight piece. then we set the other angle steel on the right there making sure it was level or nearly so. then we cut plywood to anchor to the sides for the concrete form. next we made some more stakes for the rebar and added the rebar and secured it with the rebar strap wire thingys. handy little gadget. wood handle with a swivel hook. you put the wire around the intersection of rebar, put the tool on the two eyelets of wire, move your hand in a circle motion and your done. go to the next one. then after we finished that we mixed and poured 11 bags of concrete and formed it in. total job time: 10hrs.
when the concrete cures we'll then remove the plywood forms and then sand down the steel and paint it.
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#56 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
.
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#57 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
last of the pics...
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#58 |
~~Life is either a daring adventure or nothing.~~
Join Date: Apr 2006
Posts: 6,828
|
You're one busy man. great photo blogs!
|
![]() |
![]() |
![]() |
#59 |
Master Dwellar
Join Date: Aug 2003
Posts: 4,197
|
ty! looking back over the last 35 days or so i have been real real busy.
changed the transmission on the truck built a deck at work in our outside party area put new front rotors and brakes on the truck as well as the cam position sensor helped the roommate with the master bathroom tile and finally this curb project. next week is electrical. friend has a trailer that is scarily rigged up so he has power down one wall. i've taken a peek at it. gonna be a tricky job. going to have to start at the power panel and chase the circuit down to find the problem. have to remove every switch and outlet and check for continuity. should be fun!
__________________
For your dreams to come true, you must first have a dream. |
![]() |
![]() |
![]() |
#60 |
™
Join Date: Jul 2003
Location: Arlington, VA
Posts: 27,717
|
looks much better than when you started. Now it's a jump!
|
![]() |
![]() |
![]() |
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
Thread Tools | |
Display Modes | |
|
|