The Cellar  

Go Back   The Cellar > Images > Image of the Day
FAQ Community Calendar Today's Posts Search

Image of the Day Images that will blow your mind - every day. [Blog] [RSS] [XML]

Reply
 
Thread Tools Rating: Thread Rating: 3 votes, 5.00 average. Display Modes
Old 12-24-2013, 06:41 AM   #1
SPUCK
Professor
 
Join Date: Oct 2006
Posts: 1,911
That's ridiculous. We all know a huge crack is going to open down the San Andreas Fault and everything east is going to slide into the Atlantic and sink.
SPUCK is offline   Reply With Quote
Old 12-24-2013, 12:32 PM   #2
Sheldonrs
Master Dwellar
 
Join Date: Oct 2006
Location: Los Angeles, CA
Posts: 4,412
Quote:
Originally Posted by SPUCK View Post
That's ridiculous. We all know a huge crack is going to open down the San Andreas Fault and everything east is going to slide into the Atlantic and sink.
Before anyone else says it, I AM NOT THAT CRACK!!!

__________________
Laugh and the world laughs with you; cry and the world laughs AT you.
Sheldonrs is offline   Reply With Quote
Old 12-27-2013, 11:49 PM   #3
xoxoxoBruce
The future is unwritten
 
Join Date: Oct 2002
Posts: 71,105


Quote:
The amount of material used in the construction was enormous: 300,000 feet of timber were used in the falsework, 4,700 cubic yards of earth and rock had to be excavated, and 45,000 sacks of cement were used. The means of transporting the materials across the canyon came from platforms and slings suspended from a cable 300 feet above the creek. Cement was chosen instead of steel due to material and maintenance costs. The cement came from Davenport, near Santa Cruz, and from San Andreas. The creek below supplied the needed water for the mix.
I wonder how many Redwoods died for that bridge?

Quote:
The falsework, which was the wooden structure built to shape the arch and form the wet concrete, was one of the outstanding accomplishments of E.C. Panton, the general superintendent of Ward Engineering Co. Credit also went to C.H. Purcell, California state highway engineer, F.W. Panhorst, acting bridge engineer, and I.O. Jahlstrom, resident engineer. Two months were spent building the falsework alone. One of the main difficulties was raising and holding the arch frame, exposed as it was to the high winds. The foundation also had to resist the waves which at times reached its base. Work was halted for a time until the dangers of winter storms passed.
Monterey Historical.
__________________
The descent of man ~ Nixon, Friedman, Reagan, Trump.
xoxoxoBruce is offline   Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

All times are GMT -5. The time now is 06:47 AM.


Powered by: vBulletin Version 3.8.1
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.